Project Status
The Summer Palace Smart Fire Cloud Platform project was aunched in December 2020. After a month of software development data docking, the Mesozoic completed the data docking and integration of the original fire protection system in the park, and the part not covered by the original system was transformed and upqraded with new fire alarm, electricity safety equipment and connected to the cloud platform, fully
integrating the original system and equipment, and uniformly accessing the Mesozoic smart fire cloud platform.